Verma Buildtech
Search

Cart

More Details

Product Description

. Crack Filling :

Clean the surface thoroughly.

Apply the CRACK PACK MASTER thoroughly in the crack with manual pressure.

Apply CRACK PACK MASTER at least 0.75 mm to 1mm and 3-6 inch wide across the crack as per situation.

let it cure for 1-2 days as per weather conditions and apply Nano Top       Coat for dust & dirt on the crack as per given procedure.

2.  Pipe Joint :

Reduce the glaze of the pipe with the help of emery paper and wash the surface properly.

Apply CRACK PACK MASTER with the help of funner Patti on the area of pipe which is to be inserted into the Joint.

Fix the pipe into the joint & then seal it from outside as well. Wipe the excess material & let it be cure for 3-4 days.

3.  Plast.ic Pipe :

•   Can be used in all types of plastic, cement or metal pipes.